INFRASTRUCTURE
Infrastructure
| Theory Classroom | Length | Width | Area |
| Civil | 6.1 | 4.6 | 28.06sq.m |
| MMV | 6.35 | 6.1 | 38.74sq.m |
| Electrician | 4.8 | 6.1 | 29.28sq.m |
| Fitter | 4.85 | 6.1 | 29.59sq.m |
| Lift Mechanic | 6.4 | 6 | 38.40sq.m |
| Total | 164.07sq.m | ||
| Workshops | Area (in Sq.m) | ||
| MMV | 28.6 | 9.7 | 277.42 |
| Electrician | 26.35 | 6.1 | 160.73 |
| Fitter | 18.76 | 6.1 | 114.44 |
| Lift | 6.5 | 6.05 | 39.33 |
| Drawing hall | 15.45 | 6.1 | 95.25 |
| Computer Lab | 6.05 | 6.4 | 38.72 |
| Total | 729.85 |
| Covered area | 893.92 sq.m |
| Total Area | 1232.67sq.m |